
What you are looking at: black shell, percentage dial above, pressure screen below
DY20 Jump Starter and Air Compressor with Twin-Screen Layout
Two separate readouts: a percentage gauge for the battery above and a pressure display below. Splitting them keeps the pack level visible while the pump runs, which is the usual complaint about single-screen units. 6000mAh, 500A starting, 1000A peak, 150 PSI.
Features
- Battery and pressure on separate readouts
- Pack level stays visible during inflation
- 500A starting current, 1000A peak
- 150 PSI pump with automatic cut-off
- Clamps, hose, nozzles and USB-C cable
- LED work light
Specifications
| Battery capacity | 6000mAh |
|---|---|
| Working voltage | 14.5V |
| Cylinder diameter | 19mm |
| Pressure range | 0.35-10.5Bar/5-150PSI |
| Starting current | 500A |
| Peak current | 1000A |
| Product size | 150x75x50mm |
| Net weight | 515g |
| Package size | 115*103*185mm |
| Colour box weight | 815g |
| Quantity per carton | 20pcs |
| Carton size | 530*245*390mm |
| Gross weight | 16.7kg |
Why buyers order this model
Two readouts: battery percentage above, pressure below, both visible while inflating.
How sourcing and shipping work
Confirm spec and quote
Send the model and the market you sell into. We confirm specification, MOQ and lead time, and return a quote with freight within 24 hours.
Sample, then production
We send a sample or a batch photo set for your approval, then produce against that agreed sample.
Inspect and ship
Pre-shipment inspection against the approved sample, with photos and a written report, before the balance is released. FCL or LCL from Ningbo.
Buying questions
- Why show a battery percentage instead of bars?
- A percentage is easier to act on: the operator can decide whether there is enough left for one more start before packing the unit away. Bars tend to be read as fine until the last segment disappears.
- Is the second screen a separate circuit?
- It is a second display driven by the same controller, so there is no extra board to fail. Repairs stay at board level rather than display level.
- How is the pump protected against over-pressure?
- The target is set on the panel and the controller cuts the pump at that point. A mechanical relief valve is fitted as a second line of defence, and both are checked during inspection.
- What is the MOQ for the dual-screen build?
- The same 100-500 piece band as the rest of the platform, because the housing and board already exist. Custom firmware or a new display raises the minimum, confirmed in writing.
Typical buyers
Drivers who want one unit for a flat battery and a soft tyre, and distributors selling roadside or emergency kits.
Documents we can prepare
- Commercial invoice and packing list
- UN38.3 test summary for the lithium pack
- CE or FCC declaration as required by the destination
- Pre-shipment inspection report with photos
Need a specification or a sample?
Send the model, quantity and destination port. We reply with price, lead time and packing details.
Request a quoteQuick facts: DY20 Jump Starter and Air Compressor with Twin-Screen Layout
One-line answer: Battery and pressure on separate readouts; Pack level stays visible during inflation. Export-ready from Ningbo with pre-shipment inspection.
Key points
- Working voltage: 14.5V
- Cylinder diameter: 19mm
- Pressure range: 0.35-10.5Bar/5-150PSI
- Starting current: 500A
- 500A starting current, 1000A peak
- 150 PSI pump with automatic cut-off
- MOQ is typically 100-500 pieces and higher for OEM orders; it is confirmed in writing with the quote.
- Production runs 15-30 days for regular items and 30-45 days for complex or large orders, counted from sample approval and deposit.
- OEM/ODM is available: housing, printing, gift box, manual and voltage/plug type can be tailored to the destination market.
- Quotes are FOB Ningbo by default, CIF on request. Ningbo port sails direct to Europe, the Americas, Southeast Asia, the Middle East and Africa.
Buying questions
Can it be private-labelled?
Yes. Housing colour, printing, gift box, manual and plug standard can be customised; the exact MOQ depends on the process.
Are certification and test reports available?
CE, FCC and UN38.3 documents can be prepared for the destination market, with an AQL inspection report and photos before shipment.
What are the payment and lead-time terms?
Standard terms are 30% deposit and 70% before shipment by T/T; letters of credit are used for larger orders. Production runs 15-30 days for regular items and 30-45 days for complex or large orders, counted from sample approval and deposit.
Need a quote, a sample or a spec sheet?
[email protected] · +86 181 5404 8176 (WhatsApp)
Request a quote


